Chopin Elementary has received over $2.5 Million in improvements.

  • 2013--IT infrastructure and equipment upgrades were made, including Programmatic ADA Accessibility upgrades; Flooring was repaired and replaced, along with targeted painting in areas where water damage existed.  Air-conditioning was installed as needed. Roof and masonry replacement/repair was made and mechanical upgrades to ensure adequate heating and cooling system. $1,841,583
  • 2013--Security upgrades were made to this facility, including new cameras and all supporting equipment that will be tied into the viewing station at the main office. $122,283
  • 2014--Upgraded controls associated with mechanical equipment performance, as well as add two new AC units. $255,450