Cameron Element received $9.5 Million in improvements.

  • 2011--Groundbreakers Youth Initiative Playground Program in the construction of a new play lot by removing the existing playground structure, site preparation, for new equipment installation and general construction provisions. $182,966.
  • 2012--Additional new lunchroom and serving line, upgraded adjacent interior finishes at the hallway of the Ground Level, and provide required elements to satisfy the 20% Accessible Path of Travel. $884,655
  • 2012--A complete overhaul of the school and it's associated systems. Some of the major components included a new roof, targeted masonry repair, signage, and site work. Significant electrical, plumbing and mechanical work took place, including new boilers, chiller, and generator. Interior renovations were made to the gym, corridors, and classrooms  All associated ADA-compliant upgrades were made, including a new elevator. $8,527,200
  • 2013--Replaced the existing T-12 lighting with the more energy efficient T-8 lighting. $23,826